Do you need council approval for a retaining wall in NSW?
In NSW you can usually build a retaining wall without council approval only if it's no more than 600 mm high and meets all the other state conditions. Those conditions are at least 1 m from any boundary, 2 m from any other retaining wall, and 40 m from a natural waterbody. It also must not redirect water onto a neighbour, and must not be on heritage land [1][23]. Anything bigger needs an engineer-certified design and a complying development certificate (CDC) or a development application (DA) [2][3]. Your local council's development control plan (DCP) can add further limits.
Do I need council approval?
This follows the cited NSW rules and the four local DCPs. It says “likely”, not “approved”. Check the clause, and the council, before you build.
Is the wall 600 mm or under?
Yes, 600 mm or under
At least 1 m from the boundary, and clear of the other state conditions?
Likely exempt, if it is also 2 m from another wall, 40 m from a waterbody, and does not send water to a neighbour [1]. Wollongong still caps a wall within 900 mm of a side or rear boundary at 600 mm [4].
No. It is close to a boundary, a driveway, or a mapped hazard.
Likely not exempt. Expect an engineer and a CDC or a DA. Check with council.
No. It is over 600 mm
The state codes want an engineer’s certificate for a wall supporting more than 600 mm of cut or fill [2].
Which council?
- Wollongong, including the northern suburbs and Dapto. 600 mm within 900 mm of a side or rear boundary, 1 m beyond that, engineer over 1 m [4].
- Shellharbour. Cut and fill each capped at 1 m. Engineer over 600 mm. Footings stay inside the lot [10].
- Kiama. External walls to 1 m. Listed dry stone needs consent to alter [11] [12].
- Shoalhaven. Exempt walls stay 1 m off easements and pipes, with clean fill only. Mapped acid sulfate land limits complying excavation [13] [15].
Likely complying development or a DA, plus an engineer. Check with council.
This is a plain-English summary, checked November 2026. It isn't legal advice. Your council or a registered certifier makes the final call, so check your property's planning certificate and maps first.
Step 1: is it exempt? (no approval needed)
All of these must be true [1][23]:
- no more than 600 mm above or below existing ground level
- at least 1 m from any property boundary, easement, sewer or water main
- at least 2 m horizontally from any other retaining wall on the site
- at least 40 m from a natural waterbody
- doesn't redirect surface or ground water, or wash sediment, onto a neighbour
- not on a heritage item, and in the rear yard if in a heritage conservation area
- built to the manufacturer's specifications and the Building Code
Step 2: can it be complying development? (CDC)
Walls over 600 mm may be approved as complying development where the land allows it [3]. Under the codes [2]:
- excavation is limited to 1 m deep within 1 m of a boundary, 2 m deep between 1 and 1.5 m, and 3 m deep beyond 1.5 m
- the limit drops to 1 m deep on Class 3 or 4 acid sulfate soils, or within 40 m of a natural waterbody
- the wall must be engineer-certified, drained to stormwater, and 2 m from any other wall
Step 3: otherwise, a DA
Anything that doesn't fit, such as tall boundary walls, landslip, flood or heritage land, goes to council as a DA.
Four-council comparison, checked 23 November 2026
This comparison is written for this site. It is not a council fact sheet. Each limit below is tied to the NSW SEPP or the council DCP linked in Sources. Re-check the clause before you rely on it, because DCPs change.
Local council rules
| Council | Key retaining wall rules in the DCP (summary) | More |
|---|---|---|
| Wollongong City | 600 mm max within 900 mm of side/rear boundary; 1 m if toe is more than 900 mm away; engineer over 1 m; terracing in 1 m rises with 1 m setbacks; geotech report may be required on unstable land; crib walls not within 1.5 m of boundary; front fence + wall max 1.2 m [4][7] | Wollongong |
| Shellharbour City | max 1 m cut and 1 m fill; engineer over 600 mm; footings and ag lines wholly within the lot; street-visible walls max 1 m and 1 m apart; front fence + wall max 1.2 m; side/rear wall + fence over 1.8 m set back 250 mm [10] | Shellharbour |
| Kiama Municipal | external retaining walls max 1 m above existing ground; building excavation max 1 m; batters max 1:4 (prefer 1:6); heritage dry stone walls need consent [11][12] | Kiama |
| Shoalhaven City | exempt walls also 1 m from easements, sewer and water mains; clean (VENM) fill only; DCP cut and fill limited to 1 m; acid sulfate soils and site-stability chapter applies on mapped land [13][14][15] | Nowra and Shoalhaven |
These DCP limits apply when council assesses a DA. They summarise the published DCPs and leave detail out. Always read the current clause.
FAQ
How high can a retaining wall be without council approval in NSW?
600 mm, provided every other exempt condition is met [1].
Do I need approval to replace an existing retaining wall?
Who can approve a CDC?
A council or a registered private certifier can issue a complying development certificate [3].
Sources (12), checked Nov 2026
- NSW Planning Portal: Exempt development, earthworks, retaining walls and structural supports
- Legal Aid NSW: Retaining walls
- Codes SEPP 2008 cl 3.30 (AustLII)
- NSW Planning Portal: Complying development, earthworks and structural supports
- Wollongong DCP 2009 Chapter B1, section 4.17 Retaining walls
- Wollongong DCP Chapter E12 Geotechnical Assessment of Slope Instability (Council page)
- Shellharbour DCP (Amendment 6, Aug 2026), Chapter 23 and clauses 3.6.6 / 3.6.9
- Kiama DCP 2020, Chapter 2 Site Considerations, cl 2.5.27–2.5.30
- Kiama Library: Dry stone walls; Dry Stone Walls Association (Kiama DCP heritage chapter)
- Shoalhaven City Council: Retaining walls
- Shoalhaven DCP 2014 Chapter G12
- Shoalhaven DCP 2014 Chapter G26 Acid Sulfate Soils and Geotechnical (Site Stability)